Tom’s on the roof again – well – he was yesterday. Today he was slightly under it, putting up the finishing boards on the eaves.
He also emptied the fuel tank, first pumping the heating oil into drums and then repositioning the tank away from the house so that we can dig the last trench and put in the rigid foam insulation against the basement wall (underground).
Once that last below grade insulating is done we will start on framing the entire exterior of the house and adding 4″ of rigid foam insulation to it.
This has been a long, intensive retrofit and we both look forward to the home stretch!